LouisianaHydroAxServices.com

LouisianaHydroAxServices.com

is the FIRST Hydro Ax website in Louisiana

Online Since 7-6-2012

Online Since 7-6-2012

UNderbrushing

UNderbrushing

We are the OLDEST (2005)

Grub N Root with Excavator

Grub N Root with Excavator

DOZER

DOZER

We're building a road.

Previous Next
LouisianaHydroAxServices.com LouisianaHydroAxServices.com
Online Since 7-6-2012 Online Since 7-6-2012
UNderbrushing UNderbrushing
Grub N Root with Excavator Grub N Root with Excavator
DOZER DOZER

Louisiana OQ Certified Operators, OQ Operator Certification, OQ Certified for Pipeline Work, OQ Certified for Oilfield Work,  Abbeville LA, Alexandria LA, Baker LA, Bastrop LA, Baton Rouge LA, Berwick LA, Bogalusa LA, Bossier LA, Breaux Bridge LA, Broussard LA, Carencro LA, Central LA, Covington LA, Crowley LA, Denham Springs LA, DeRidder LA, Donaldsonville LA, Eunice LA, Franklin LA, Gonzales LA, Grambling LA, Gretna LA, Hammond LA, Harahan LA, Houma LA, Jeanerette LA, Jennings LA, Jonesboro LA, Kaplan LA, Kenner LA, Lafayette LA, Lake Charles LA, Leesville LA, Mandeville LA, Mansfield LA, Marksville LA, Minden LA, Monroe LA, Morgan LA, Natchitoches LA, New Iberia LA, New Orleans LA, New Roads LA, Oakdale LA, Opelousas LA, Patterson LA, Pineville LA, Plaquemine LA, Ponchatoula LA, Port Allen LA, Rayne LA, Ruston LA, Scott LA, Shreveport LA, Slidell LA, Springhill LA, St. Gabriel LA, St. Martinville LA, Sulphur LA, Tallulah LA, Thibodaux LA, Ville Platte LA, Walker LA, West Monroe LA, Westlake LA, Westwego LA, Winnfield LA, Winnsboro LA, Youngsville LA, Zachary LA and more

All Louisiana Hydro-Ax Services operators are OQ Certified for Hydro-Ax Machines, Dozers, Backhoes, Tractor and Shredder, Weed Eaters, and all other equipment needed to clear and or maintain pipeline right of ways, transmission line right of ways, and all ROWs.

 

D.O.T. Rule 49 CFR Parts 192 and 195 - Impact on Operators and Contractors.

 

For all of your Certified OQ Operator needed services
Call Louisiana Hydro Ax Services First, Last, Always!

The rule places a significant compliance burden on operators and contractors. Pipeline operators and technicians must be qualified and certified as of October 28, 2002, in order to keep working in this industry. Contractors will have to have a "qualified workforce" that is able to perform activities for multiple operators and they must be qualified and certified under each operator's plan. See Federal Register on D.O.T. Rule
What is OQ ?

The Operator Qualification Rule is part of 49CFR Part 192 (subpart N) and 49CFR Part 195 (subpart G) under the Department of Transportation, Office of Pipeline Safety. (see http://ops.dot.gov/regulate.htm) This rule requires pipeline operators to develop and maintain a written qualification program for individuals performing covered tasks on pipeline facilities.
Key dates associated with OQ

    October 26, 1999 OQ rule went into effect, see: D.O.T. website
    April 27, 2001 Operators must have a written qualification program
    October 28, 2002 Operators and contractors must complete the qualification of individuals performing covered tasks

For all of your Certified OQ Operator needed services
Call Louisiana Hydro Ax Services First, Last, Always!

Louisiana Hydro Ax Services says " Do Not Pay By the Acre"
Click Here to See What Our Clients Say About Us
Louisiana Hydro Ax Operators are OQ Certified
Click Here to Watch Our Machines in Action

For all of your Hydro Ax needs
Call Louisiana Hydro Ax Services First, Last, Always!

Click Here to Call Louisiana Hydro Ax Services
Click Here to Email Louisiana Hydro Ax Services!

We Accept

Louisiana Hydro Ax Services is Fully Insured.

 

 

Hydro Axing

Forestry Mulching

Additional Services